NRG Bloom modular data center
Powering the Future from Stranded Energy

Off-grid data centers on stranded gas.

Operational in Bayelsa State, Nigeria since February 2025.

1 MW
Energized Capacity
5 MW
Pipeline Under Development
300+ t
CO₂e Mitigated
$0.03/kWh
Energy Cost

Operating figures as of August 2026, NRG Bloom measurements. See the Ogboinbiri case study for sources.

NRG Bloom Ogboinbiri expansion site, Bayelsa State, Nigeria
Operational Proof

Live in Bayelsa State, Nigeria Since February 2025

Methane that would otherwise vent or flare now powers continuous, revenue-generating workloads.

The Opportunity

The World Flares Almost as Much Gas Each Year as Africa Consumes

167 billion cubic meters of gas were flared in 2025, the third straight annual rise and the highest level since 2019. NRG Bloom puts that gas to work at the wellhead. A regulatory burden for energy producers becomes revenue.

$54B value of gas flared in 2025, from a volume that matches Africa's annual gas consumption (World Bank, 2026)
Gas flare at wellhead site in Nigeria
Aerial view of a rural Niger Delta community surrounded by tropical forest
Off-Grid by Design

No pipeline. No grid. No waste.

We generate power on-site, consume it on-site, and skip the broken transmission layer entirely. Where the grid ends, we begin.

Why Every Site Pays for Its Next Stage

Every Site Earns Before It Scales

Our stage-gate model means zero speculative builds. Each phase generates revenue and de-risks the next, from day one hashrate to full AI inference.

01
Revenue from Day 1

Validate with Hashrate

Deploy ASIC miners to stress-test gas supply, power stability, and site conditions. Immediate BTC revenue while proving the site works. If a site fails validation, the equipment is redeployed.

60-90 days Deployment
Redeployable Equipment
BTC Revenue Stream
02
Proven Site, Proven Cash Flow

Harden Infrastructure

Install high-bandwidth connectivity, Tier III-ready cooling, and redundant power. The site transforms from mining outpost to enterprise-grade facility, funded by Stage 1 revenue.

Fiber/MW Connectivity
Tier III Cooling Grade
99.5%+ Uptime Target
03
AI Compute on Proven Sites

Scale to AI Inference

Deploy GPU clusters for AI inference on sites that have already proven their power. Bitcoin hashrate remains as dynamic load balancer.

$0.03 Per kWh
GPU AI Inference
NRG Bloom bitcoin mining container

Have Stranded or Flared Gas?
Put It to Work.

Tell us where you flare today. We assess the site, deploy modular compute, and you earn from gas you were burning. Investors can review the same figures on our investor page.