NRG Bloom modular data center
Powering the Future from Stranded Energy

Off-grid data centers on stranded gas.

We deploy modular compute infrastructure at off-grid energy sites worldwide, converting stranded gas from an environmental liability into AI-ready processing power.

1 MW
Energized Capacity
5 MW
Under Development
300 t
CO₂e Mitigated
$0.03/kWh
Energy Cost
NRG Bloom Ogboinbiri expansion site, Bayelsa State, Nigeria
Operational Proof

Live in Bayelsa State, Nigeria Since February 2025

Methane that would otherwise vent or flare now powers continuous, revenue-generating workloads.

The Opportunity

The World Flares Almost as Much Gas Each Year as Africa Consumes

151 billion cubic meters of natural gas were flared in 2024, the highest level since 2007, wasting roughly $63 billion in energy. NRG Bloom captures this resource at the wellhead and converts it into high-performance compute, turning a regulatory burden for energy producers into a revenue-generating asset.

151B cubic meters of gas flared in 2024, close to Africa's total annual gas consumption (World Bank)
Gas flare at wellhead site in Nigeria
Aerial view of a rural Niger Delta community surrounded by tropical forest
Off-Grid by Design

No pipeline. No grid. No waste.

We generate power on-site, consume it on-site, and skip the broken transmission layer entirely. Where the grid ends, we begin.

Why We're Profitable

Every Site Earns Before It Scales

Our stage-gate model means zero speculative builds. Each phase generates revenue and de-risks the next, from day one hashrate to full AI inference.

01
Revenue from Day 1

Validate with Hashrate

Deploy ASIC miners to stress-test gas supply, power stability, and site conditions. Immediate BTC revenue while proving the site works, low CapEx, high signal.

~90 days Deployment
Low CapEx Risk
BTC Revenue Stream
02
Proven Site, Proven Cash Flow

Harden Infrastructure

Install high-bandwidth connectivity, Tier III-ready cooling, and redundant power. The site transforms from mining outpost to enterprise-grade facility, funded by Stage 1 revenue.

Fiber/MW Connectivity
Tier III Cooling Grade
99.5%+ Uptime Target
03
High-Margin AI Compute

Scale to AI Inference

Deploy GPU clusters for AI inference at a fraction of grid-powered costs. Bitcoin hashrate remains as dynamic load balancer, every watt earns, every second of the day.

$0.03 Per kWh
GPU AI Inference
3-5x Margin vs Grid
NRG Bloom bitcoin mining container

Turn Environmental Liability
into Digital Asset

Whether you're an energy producer with stranded gas or an investor seeking de-risked infrastructure returns, let's talk.